To generate a permit through the OneCall system, there are a few criteria needed to be met before the system is able to make the request:
- The permitting body must be registered with our service
- The job type and activity must be a valid type of excavation.
- The work must take place on or near the council or road reserve assets.
A valid job activity must have some sort of excavation to trigger the creation of the permit request.
The following job types DO NOT generate a permit request:
- Subdivision
- Conveyancing
- Planning & Design
- Tendering
These activities are considered non-invasive, so it's not necessary for the system to apply for a permit.
Comments
0 comments
Please sign in to leave a comment.